Mastt vs Sitetracker
Head to head in Construction Scheduling Software. Facts checked Nov 20, 2026. Every fact links to the vendor page it came from. How we score
TL;DR
Mastt scores higher in Construction Scheduling Software: 51.5 (#5 of 42) against 34.5 for Sitetracker (#28).
Choose Mastt if you want
- The higher SS Score in Construction Scheduling (51.5 vs 34.5)
- More of the key features (4 of 8 vs 2)
- A free plan
- Single sign-on
Choose Sitetracker if you want
- SOC 2 compliance
How Mastt and Sitetracker score
Each SS Score adds up six factors weighted to 100. The longer bar leads on that factor.
- 75%
User reviews 30 points
75% - 50%
Features 20 points
25% - 20%
Trust & upkeep 20 points
35% - 100%
Pricing clarity 15 points
0% - 0%
Popularity 10 points
0% - 0%
Partnered 5 points
0% - 51.5SS Score34.5
What’s different between Mastt and Sitetracker?
Mastt has more of the key features (4 of 8 vs 2), a free plan and single sign-on.
Sitetracker has SOC 2 compliance.
Which construction scheduling features does each have?
The 8 capabilities buyers compare most in Construction Scheduling Software. A dash means we couldn’t find it on the vendor’s own pages.
Critical Path Method (CPM) Scheduling
MasttSitetrackerGantt Charts & Timeline Views
MasttsourceSitetrackerResource Allocation & Leveling
MasttSitetrackerBaseline Tracking & Schedule Variance Analysis
MasttsourceSitetrackerProgress Tracking & Percent Complete
Cost Loading & Budget Integration
MasttSitetrackerField & Subcontractor Schedule Collaboration
MasttSitetrackersourceSchedule Reporting & Dashboards
MasttsourceSitetracker
Pricing, security and company facts
Pricing
Security and compliance
Mastt vs Sitetracker: common questions
Is Mastt better than Sitetracker?
In Construction Scheduling Software, Mastt scores 51.5 (#5 of 42) and Sitetracker scores 34.5 (#28). Mastt has more of the key features (4 of 8 vs 2), a free plan and single sign-on. Sitetracker has SOC 2 compliance.
Do Mastt and Sitetracker have a free plan?
Mastt has a free plan; we found none for Sitetracker.
Which has more construction scheduling features?
We found 4 of the 8 key features on Mastt's site and 2 on Sitetracker's.
